Case Study: 28 Day 4100 Shovel Undecking

unexpected Repairs. No Timeline Extensions.

Completing a full swing system replacement on a mining shovel is a major feat, especially when you’re one of the few companies that can engineer, manufacture, and install the entire system in-house. At a southern Arizona mine, L&H Industrial took on the challenge with a strict 28-day outage window, delivering a complete swing system overhaul and extensive crawler frame repair on a Komatsu/P&H 4100A electric rope shovel. Leveraging our proprietary lift system, our on-site team kept the schedule intact even as the scope expanded dramatically.

Download the case study to see how we brought the shovel back online, on time and without compromise, beating the industry norms.